IE2308-Economics For Engineers

Assignment

Practice 1

A construction company bought a 180,000 metric ton earth sifter at a cost of $65,000. The company expects to keep the equipment a maximum of 7 years. The operating cost is expected to follow the series described by 40,000 + 10,000k, where k is the number of years since it was purchased (k = 1, …, 7). The salvage value is estimated to be $30,000 for years 1 and 2 and $20,000 for years 3 through 7. At i = 10% per year, determine the economic service life and equivalent annual worth of the sifter using a spreadsheet.

Practice 2

Save your time - order a paper!

Get your paper written from scratch within the tight deadline. Our service is a reliable solution to all your troubles. Place an order on any task and we will take care of it. You won’t have to worry about the quality and deadlines

Order Paper Now

Steel cable barriers in highway medjans are a low-cost way to improve traffic safety without busting state department of transportation budgets. Cable barriers cost $44,000 per mile, compared with $72,000 per mile for guardrail and $419,000 per mile for concrete barriers. Furthermore, cable barriers tend to snag tractor-trailer rigs, keeping them from ricocheting back into same-direction traffic. The state of Ohio spent $4.97 million installing 113 miles of cable barriers. (a) If the cables pre- vent accidents totaling $1.3 million per year, determine the rate of return that this represents over a 10- year study period. Use a spreadsheet. (b) Now, determine the rate of return for 113 miles of guardrail if accident prevention is $1.1 million per year over a 10-year study period. To do so, first write the ROR relation and then find i* using a single-cell spreadsheet function.

Practice 3

A company that manufactures magnetic flow meters expects to undertake a project that will have the cash flows below. At an interest rate of 10% per year, what is the equivalent annual cost of the project? Find the AW value using a spreadsheet.