Systems development project

In this assessment, students must work in a group to prepare a case study analysis of a
systems development project.
You are required to form groups of Three to Four (3 to 4) students.
Your group is required to research and analyse a real life situation and prepare
a full analysis of a systems development project. Feel free to discuss your real
life situation project with your lecturer before engaging in any work. Suggested
topics below.
You may use www.creately.com, www.diagrams.net, MS Word, Visio or any other
modeling tool to create diagrams.
Your systems analysis and design project should include the following:
• Executive summary (max. 1/2 page). 2.5 Marks
• Introduction including description of the business, problem/opportunity identified
and goal and objectives of this project (max. 1 pages). 2 Marks
• Data gathering methodology and results (max. 1 pages). 2.5 Marks
• Existing system including current system overview, FDD, DFD, and Data
Dictionary. 6 Marks
• Proposed system including system overview, system requirements checklist,
DFD, Data Dictionary, Object relationship diagram, Use Cases, Class Diagram,
and Sequence Diagrams. 12 Marks
• Conclusions and recommendations (max. 1/2 page). 2.5 Marks
• Group reflection on Assessment 3 (max. 1/2 page). 2.5 Marks